Located on a 140-acre site in Burlington, MA, Sun Microsystems has been Master Planned to consist of a 1.3 million square foot campus for office, laboratory and classroom space along with conference centers, cafeterias, and retail shops. Presently, six central buildings are occupied and construction documents have been prepared for two additional buildings as well as a building to house an anechoic chamber for high-tech testing of electronics. Ms. Bachand prepared construction documents and performed construction administration services for the four most recently completed main campus buildings, and worked with the project's engineers on the site planning and construction documents for the anechoic chamber building.
Some projects described were performed by the principals while with former employers, or as independent consultants